Tenant Fit Out Project: New Hampshire Ave, NW, Washington DC
Interior demolition and build out of an existing 1795 sf office space on the 6th floor at 600 New Hampshire Avenue, NW (Watergate Office Building) for law firm.
Interior demolition and build out of an existing 1795 sf office space on the 6th floor at 600 New Hampshire Avenue, NW (Watergate Office Building) for law firm.
The space feature includes: three large store front offices, reception and vestibule entry area, pantry and LAN closet, computer room and work rooms. Our SOW included demolition, carpentry and installation of all finishes (drywall, ceilings, cabinets, flooring & trims, painting, carpet, door & frames).
Read More
Historic Preservation Project: Lakeview Avenue, Baltimore, MD
Built in 1920, this historic apartment building underwent a facade restoration to its original design. Our team handled every aspect of this project adhering to the strict historic preservation protocols of Baltimore Maryland.
Read More
Tenant Fit Out Project: Greenbelt Road, Greenbelt, MD
Interior demolition and build out of an existing 3000 sf office space on Greenbelt Road, Greenbelt, MD for a Dialysis Center. The space feature includes: patient rooms, large store front offices, reception and vestibule entry area, employee pantry and work
rooms.
Our SOW included demolition of an old bank space including removal of existing 1950 concrete vault, safe and ATM, rough and finish carpentry and installation of all finishes (drywall, ceilings, cabinets, flooring & trims, painting, carpet, door & frames).
Read More
Historic Preservation Project: Lakeview Avenue, Baltimore, MD
A historic multifamily apartment building that consists of twelve [12] rented units. Our SOW included demolition of front façade and full restoration back to its original 1900's design and construction.
This scope included: new 16'-0" and 8'-0" long fiberglass Tuscan Tapered columns, styrofoam dentil course and cornice, eaves, wooden railing, flooring, rough and finish carpentry, installation of all finishes (drywall, ceilings, trims and painting).
Read More
BRANCH BANKS – Base Buildin4. Ground-Up Construction Management Project: Branch Bank projects, MD, VA and DCg & Tenant Improvement MD, VA & DC
Responsible for the delivery of over twenty (20) prototypical branch banks located in MD, VA and DC, project size range from 2,000 SF - 4,200 SF with a price range of $1.5 - $4.0 million.
I supervised a team of Architects, Engineers, General Contractor, Consultants and Vendors from the programming phase through to closeout and LEED commissioning. My team successfully delivered each project on time and on-budget.
Read More
Building Addition Construction Management Project: Shenandoah Valley Academy Addition, New Market, VA
Demolition of 1970’s Olympic size swimming pool facility, 4800 SF addition of a state-of- the-art sport facility and renovation of 8000 SF multipurpose gym. This includes a new HVAC system, lighting system for ball fields, players’ change rooms, male/female bathrooms, kitchen, conference area, 3500 SF outdoor brick patio and portico.
Read More
Major Renovation Construction Management Project: Seabrook SDA Church Reconstruction, Lanham, MD
A complete gut rehab of a 6500 SF church facility and 4500 SF sanctuary code upgrades. The 6500 SF classroom area was totally gutted and rebuilt including new foundation and roof support, new epdm roof, HVAC system, electrical, plumbing, and sprinkler system, finishes and baptism pool.
Read More
Major Renovation Construction Management Project: Light Bearers Mission SDA Church, Clinton, MD
Conversion of a 4000 SF restaurant building into a church. The building was fully gutted and rebuilt, including new epdm roof, exterior frontage, mechanical, electrical, plumbing, sprinkler, systems, and finishes.
Read More